1 mold, 28 blocks, 4.5 m3 PUR and so many questionmarks…

The buildingweek(s) began bright and early on monday 8 a.m. when the rest of the world had yet to arise. A peacefull Bouwkunde would soon be disturbed by the – seamingly endless – sound of our drillmachines, lengths shoutouts and some curses at the grasshoppermodels.

But by the end of the day.. we had sort of successfully extracted the right drawings, built the side panelling and support system, one testblock PURed to test the PURmachine and we set up the first (203) block-to-be-PURed-tuesday.

2014-10-20 17.06.43

Some facts

  • 1 object
  • 2 weeks for a preliminary design
  • 2 weeks for pre-fabrication
  • 1 week in Izmir, Turkey
  • 2 days of building
  • 7,5 ton of mdf for molds
  • 25m2 of machined mold area
  • The result: 180kg of composite material

The finished product

After one week of working hard, the actual product got finished.
At the end of the  building week it got transported to Yasar University. And after a small presentation we all enjoyed the great and shiny object we produced.

The arrival;

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA

The final product;

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA

 

A big thanks to everybody who worked so hard to realize this amazing project!

 

Factory days

Today we present our design at the Yasar University, so it’s time for a wrap up of the week here in Izmir. After some guided tours and relaxing on the beach, we started working on the piece.

Hand layup:IMG_2369

Panels from the molds:
IMG_2399

Cutting the edges:
IMG_2401

Sanding:
IMG_2419

Creating the inner part:
IMG_2434

The piece standing upright:
IMAG0213

 

Today the object is finished and will be placed at the Yasar University campus.

Maarten & Luuk